Why the drawing decides the price
Two parts can look identical on screen and quote three times apart. The difference is almost never the material. It is the handful of drawing decisions that force a slower process, a second setup, or a hand operation.
These nine checks are the ones that move the number most often. None of them require CAD skill to apply.
The nine checks
1. Wall thickness. Below 0.8 mm in SLS, or 1.2 mm in casting, walls become a yield problem rather than a design choice. Thicken them or expect attrition in the quote.
2. Uniform section. A part that is 6 mm thick in one place and 2 mm next to it will sink and warp. Ribs are cheaper than mass, and they cool evenly.
3. Powder escape. Printed parts are surrounded by powder. Any closed hollow needs at least two escape holes, or it will trap powder and rattle forever.
4. Draft on cast faces. A cast part needs 1–2° of draft on every face that leaves the mould, or the silicone tears at the edge and the tool dies early.
5. Undercuts. In casting, an undercut is a cut line through your A-surface. Move it to a hidden edge or redesign it out.
6. Tolerances on the right features. A blanket ±0.1 mm note on a cosmetic part triples inspection cost for no benefit. Call tolerances only where they matter.
7. Datum choice. If the datum is a face that will be painted, the measurement is measuring paint. Choose a machined or moulded reference.
8. Threads. A printed or cast thread under M4 holds poorly. Specify a machined or pressed insert instead.
9. The finishing note. "Painted" is not a specification. Colour, gloss, texture and which faces are A-surface all change the price separately.
The three that save the most
In practice, checks 1, 6 and 9 account for most of the variance we see. Wall thickness is a yield multiplier. Over-specified tolerance is an inspection multiplier. An unfinished finishing note is a rework multiplier.
Fixing those three rarely changes the design intent. It changes how many parts survive the process.
What to send with the drawing
A STEP file, not just a PDF, so the geometry can be checked rather than interpreted. The quantity, including whether it repeats. The colour and texture target as a physical sample or a chip, not a screenshot. And a note on which faces are seen by the end user.
That last one is the single most useful sentence you can write. It lets a shop route the money to the surface that matters and leave the hidden faces rough.
What we check that you cannot see from the drawing
Three things only show up once the geometry is in the software. Whether the minimum wall is actually where the note says it is — notes and models drift apart after the fifth revision. Whether a fillet radius is smaller than the tool that has to cut it. And whether the part can be held in a fixture for the machining operation the drawing implies.
All three are cheap to fix at quoting and expensive to fix at inspection. This is why we ask for STEP rather than a PDF: the note can be wrong, the solid cannot.
A drawing we can quote in an hour
It has a solid model attached, a quantity with a repetition flag, one colour reference, one texture callout, and a sentence naming the A-surface. Tolerances appear only on the six or eight features that matter.
That is the whole list. Drawings that take a week to quote are not more complex — they are the same drawings with the decisions left open, and every open decision becomes an email.