Why the same part quotes at 4.80 and at 11.20
Two shops look at an identical STEP file and come back with prices that differ by more than double. Neither is lying. They are quoting different things and calling them the same word.
A casting quote is not one number, it is six. Once you can see the six, you can tell whether you are comparing suppliers or comparing assumptions.
The six lines
Master. A physical pattern for the mould. Printed or machined, then finished to the surface you want. This is a one-off cost, though it repeats if the design changes.
Tool. The silicone block itself. Poured around the master, cut open, cured. Also one-off, and consumed as you produce.
Material. PU resin by weight, plus pigment. Scales directly with quantity, and is usually the smallest line at low volume.
Labour. Casting, trimming, deflashing, assembly. Scales with quantity, but not linearly — the first ten parts cost more per part than the next ninety.
Finishing. Paint, texture, inserts, printing. Priced per part and entirely optional. This is the line that moves a part from "functional" to "cosmetic".
Freight and packing. Usually quoted separately or buried at the bottom. Ask which.
Only two of them scale
Material and direct labour move with quantity. Master, tool and most of the setup do not. That single fact explains almost every pricing disagreement in this industry.
At 20 pieces, tooling dominates the quote. A 400 dollar tool spread over 20 parts adds 20 dollars per part before any plastic is poured. At 200 pieces the same tool adds two. The part did not get cheaper; the tool got amortised.
So when a shop says "the price drops at 100 pieces", they are not offering a discount. They are telling you where their setup stops dominating.
What a very low number is telling you
A quote far below the others usually means one of four things, and only one of them is good.
They excluded finishing, so the part arrives unpainted and you discover the real cost at goods-in. They quoted a shorter mould life, so part 25 drifts and nobody planned the second tool. They assumed a looser tolerance than your drawing states. Or they simply want the job and will recover the difference on the change order.
None of these are dishonest if they are written down. The problem is that they are usually not written down.
Three questions before you compare
Ask what the quoted price excludes. The answer should name finishing, packing, freight and inspection, in that order.
Ask how many shots the tool is expected to give. If the number is below your order quantity, you are being quoted two tools and shown one.
Ask whether the tolerance figure is what they hold or what they hope. A shop that answers "±0.15 per 100 mm, and we report it" is telling you something different from one that answers "standard".
A worked comparison
Sixty painted covers, one colour, one texture. Shop A quotes 4.80 per part with a 380 dollar tool. Shop B quotes 3.90 per part with a 900 dollar tool plus a 0.45 per part painting charge.
At 60 pieces A lands at 8.13 per part; B lands at 15.00 per part plus the tool. At 400 pieces A is 5.27 and B is 4.35, and B wins. Same part, opposite answers, because the volumes sit on different sides of the amortisation curve.
That is the entire argument. Not who is cheaper, but at what quantity each one becomes cheaper.
Two questions that change the answer
How many shots will this tool give? A quote that assumes 25 and your order of 300 are not comparable. The honest answer names a number and says what happens at part 26. If nobody can tell you, assume two blocks and price accordingly.
What is excluded? Finishing, packing, inspection and freight are the four that hide. A 4.20 quote without painting and a 5.10 quote with it are the same quote until you add the difference — and the painted one tells you what painting costs, which is information you can use on the next job.
Reading a quote in five minutes
Divide the price by the quantity. Multiply the tool line by 0.8 — that is roughly what a second block costs when the master survives. If the per-part price plus a third of the tool is still above your target, the shop is not expensive, the volume is wrong.
Then read the exclusions, then the tolerance note, then the lead time. In that order. Price disagreements are usually exclusions, and late deliveries are usually a colour approval that arrived after the tool was cut.